Stevendale Rebuilding Projects

Updated June 28, 2017

Building A: Sanctuary Building Projects (Phase One)

FB_IMG_1491255053921IMG_20170403_162932

  • Repair Sanctuary Foundation: Project Completed through contractor (Baton Rouge Foundation Repair) with donations from NAMB and LBC
  • Rebuild Stage: Project completed by FBC Haughton, Louisiana. and Williams Boulevard Baptist Church of Kenner, Louisiana
  • Remove Damaged and Destroyed Pews: Project completed by University of Tennessee Students and The House, Chattanooga, TN
  • Purchase 300 Sanctuary Chairs: Project completed, chairs to arrive at the end of May 2017 (special thanks to Crossroads Baptist Church of Conroe, Texas for their special offering to create our starter fund.)
  • Replace Interior Doors: Project completed by FBC Haughton, Louisiana.
  • Repair Air Conditioner Unit: Project completed by FBC Haughton, Louisiana.
  • Retrofit LED lighting: Project completed by Stevendale members
  • Remove Paneling, Hang & Float Sheetrock: Project completed by Stevendale members.
  • Repair Organ: Project completed funded by Stevendale Members (Still need a Leslie Speaker 122 or 147 type. Estimated purchase Cost $1,500, looking for donation of used.)
  • Paint Sanctuary Interior Brick and Sheetrock: Project completed, fully funded by Calvary Baptist Church, Alexandria, LA.
  • Install Flooring: Project in progress Funding by FBC Haughton, Louisiana.
  • Repair and Bring Sanctuary Restrooms to ADA Compliance: Project in Progress with help from Istrouma Baptist Church and East Leesville Baptist Church.
  • Rebuild 6-inch-high Concrete ADA entry ramp to Sanctuary Side Entrance: (This project is potentially changing to a re-pour of the sidewalk along the sanctuary to address potential continued foundation and moisture issues Estimated Cost $5,000)

Building G: Guest House (Phase One)

IMG_20170320_091647IMG_20170320_095824

  • Mud Out Building: Project completed by Grand Cane Baptist Church, of Grand Cane, Louisiana.
  • Chainsaw and Remove 2 small trees and one medium: Project completed by Grand Cane Baptist Church, of Grand Cane, Louisiana.
  • Move a Portable Building to North Parking Lot: Project completed by Grand Cane Baptist Church, of Grand Cane, Louisiana.
  • Frame Shower Stalls: Project completed
  • Replace Outlets and install Restroom Vents: Project Completed by Istrouma Volunteer.
  • Install Plumbing for Shower Facility: Project completed by Stevendale members
  • Hang & Float Sheetrock: Project in progress, some completed by Key Life Fellowship
  • Frame and install shower room doors:
  • Install 2 Window Unit Air Conditioners: 
  • Furnish with 8 Bunk Beds:

Building B: Children’s Ministry Building (Phase Two)

IMG_20170320_091504IMG_20170320_091435

  • Mud Out Building: Project completed with the help of Grand Cane Baptist Church, Darrel, David, and Dianne Jans. FBC Haughton, Louisiana. Old River Baptist Church, FBC Vidalia Georgia, and many walk-ons.
  • Restoration of Framing: Project completed by Missouri Baptist Disaster Relief teams, First Baptist Tuscaloosa, and  Students of Oklahoma State University Baptist Collegiate Ministries
  • Electrical Rough In: Project in Progress New Electrical Installation
  • Hang & Float Sheetrock: ______________
  • Install Replacement Air Conditioning: _________________
  • Replace Interior Doors:______________
  • Prime and Paint: ______________ 
  • Replace Exterior Doors:______________
  • Install Flooring: _________________
  • Furnish: _________________

Building E: Administrative Building (Phase Two)

IMG_20161207_115554

  • Mud Out Building: Project completed with the help of Many local and out of state volunteers and Williams Boulevard Baptist Church, of Kenner, LA
  • Electrical Rough In: Project in progress by Williams Boulevard Baptist Church, of Kenner, LA
  • Hang & Float Sheetrock: Project partially completed by East Leesville Baptist Church and by Charles Watson and Friends. 
  • Replace Interior Doors: Project partially completed by Charles Watson and Friends. 
  • Prime and Paint: ______________
  • Replace Exterior Doors: _____________
  • Install Flooring: _________________
  • Furnish: Furnishing Mostly provided for through Frick and Frack Ministries

Building C: Education Building (Phase Three)

FullSizeR_4

  • Mud Out Building: Project completed with the help of many.
  • Electrical Rough In:______________
  • Hang & Float Sheetrock: ______________
  • Replace Interior Doors:______________
  • Prime and Paint: ______________
  • Install Flooring: _________________
  • Replace Exterior Doors: _________________
  • Furnish: _________________

Building D: Fellowship Building (Phase Three)IMG_20161123_085526IMG_20170116_094847

  • Mud Out Building: Project completed with the help of Westside Church of Omaha, Nebraska.
  • Electrical Rough In:______________
  • Hang & Float Sheetrock: ______________
  • Replace Interior Doors:______________
  • Prime and Paint: ______________
  • Install Flooring: _________________
  • Furnish: _________________

Biggest Current Needs:

We are trying to finish phase one and move on to phase two. There is some overlap, because schedules dictate that we must. We get stuck at bottlenecks, where nothing more can be done in an area until a certain thing is done. The bottlenecks usually come in areas where skilled volunteers are needed. Here are the 4 biggest needs.

  • Electricians
  • Plumbers
  • Carpenters
  • Concrete Workers (For busting and pouring in certain areas)

If you are skilled in one of these areas and can volunteer your services, PLEASE contact pastor Stephen Young II cell (225) 436 – 9366 . We need your help!